铁路隧道工程施工承包合同(中英文)

VIP免费
2025-03-07 0 0 144KB 22 页 5.9玖币
侵权投诉
铁路隧道工程施工承包合同
CONTRACT OF RAILWAY TUNNEL ENGINEERING CONSTRUCTION
(翻译:张云军)
签署日期 Date of Signature
甲方:中铁集团(以下简称甲方)
Party A: China Railway Group. ( hereinafter referred to as Party A)
乙方:隧道工程公司(以下简称乙方)
Party B: Tunnel Engineering Company (hereinafter referred to as Party B)
条款目录 CONTENTS
一、 组成合同的文件: Documents Constituted Contract
二、 工程概况 General Review of Project
三、 工期 Work Term
四、 工程数量的核实和确认 Check and Confirmation of Work Quantity
五、 承包工程造价 Project Cost
六、工程质量标准与验收 Project Quality Standards and Acceptance
七、隐蔽工程检查和签证 Inspection and Confirmation of Hidden Works
八、材料的供应 Supply of Material
九、工程变更 Alteration
十、双方责任与权利 Responsibilities and Rights of Parties
十一、安全施工 Safe Construction
十二、进度计划 Progress Schedule
十三、承包工程价款支付和结算 Settlement and Payment
十四、履约担保 Performance Bond ( PB 履约金 2-5%)
1
十五、保修 Maintenance and Repair
十六、违约责任 Liabilities
十七、 其它约定 Miscellaneous
鉴于:甲方系路建设工程总承包商,铁路建设要并经过业主同意,通招标将一
隧道工程承包给具有隧道建设资质和能力的专业公司施工;
鉴于:乙方系业从事隧道工程建设的工公司,有相应的工程资质和能,中标承
本合同工程;
据此,甲方将一号隧道的洞身钻爆开挖、洞门修建、防排水设施、锚网喷支护、衬砌、洞内沟
槽及洞室和相的隧道施工附属项目承给乙方施,经双方协商一致,订本合同,
同遵守。
WHEREAS: Party A being general contractor of railway engineering will, for necessity of railway
construction and gain employers consent, contract through bidding No. One tunnel project to the
professional company with qualification and capability of tunnel construction for execution;
WHEREAS: Party B being the professional company of tunnel construction with corresponding
engineering qualification and capacity has won bidding and been awarded the project hereof.
NOW THEREFORE, Party, in accordance with the necessity of construction, consign the works of
Tunnel No. 1 to party B for execution, including blasting excavation, tunnel portal construction,
drainage facilities, bolting and shotcrete lining, lining, channel and ditch within tunnel in addition
to corresponding projects affiliated to tunnel engineering, for which parties by mutual agreement
conclude and enter into this contract , parties hereby agree as follows:
一、组成合同的文件: Documents Constituted Contract
组成本合同的文件包括:including the following:
1、本合同协议书 Agreement hereof
2、本合同条款 Terms and conditions hereof
3、本工程适用的标准、规范及有关技术文件
Standards, norms and concerned technical documents applicable to this engineering.
4、甲方技术交底图纸 Drawings delivered by party A, with explanation of technology.
5附件 1《承包人承包工程项目一览表——工程量清单》,以及双方有关工程的洽商、变更等
书面协议或文件视为本合同的组成部分。
2
Appendix One: The List, Bill of Quantity of Engineering contracted by contractor in addition to
the agreements or files in writing relative to negotiation, alteration of engineering by parties hereto
will be deemed as integral parts hereof.
二、 工程概况 General Review of Project
㈠、工程名称:一号隧道。Project Name : Tunnel No. One
㈡、工程地点:DK 094+506 DK095 +658 Project Place:
㈢、工程规模:隧道总长 1152m Project Scale: Total Tunnel Length : 1152 Meters
㈣、承包范围和内容包含: Contracted Scope and Contents including as follows:
1洞身开挖(围岩级别分类情况见工程量清单)。具体内容包括:临时设施建设、脚手架,
测量,人工挖除整修,钻眼、爆破、通风、出碴、运料、照明,管线及排水,木支撑制作、安装、
拆卸,整修边,超挖回填等为完成隧开挖的一施工、完工作
碴运从出碴洞1 用地甲方责)。
Tunnel Execution: The grade of surrounding rock refer to List of Quantity, particulars thereof
include as follows: temporary facilities, scaffolding, measurement, artificial digging renovation,
drilling, blasting, ventilation, ballast leaving, transport material, lighting, pipeline and drainage,
the production, installation, disassembly of wooden support, repair side ditch in addition to
backfill for over excavation and other works which are necessity for execution, complement and
defect repairs of tunnel project.
2、支护 Support
A砂浆、中空注浆Mortar anchor, hollow grouting anchor.
B、超前小导--工制作、运、脚手架、钻管等全部制安过程;
Advanced small pipe - pipe manufacture, transport, scaffolding, drilling, pipe, jacking and all
other process of manufacture and installation.
3、衬砌,包括洞衬砌、仰拱及其钢筋仰拱底、大小避车洞衬砌。
Lining, including tunnel, inverted arch and reinforcement, the inverted arch filling, bedding in
addition to lining of refuge holes of various sizes.
三、工期 Work Term
开工日期: 工日期为: Commencement date is , completion date is .
3
四、 工程数量的核实和确认 Check and Confirmation of Work Quantity
1、乙方甲方施工技术人员提完工程量计算单或签证,以便甲方乙方进验工计价。
Party B will submit party As technical personnel with List of Completed Quantity or Certificate of
Quantity for party As acceptance and calculation of party B’s works.
2、工程量验收方Means of Quantity Acceptance
隧道开挖数量隧道设计开挖算;衬砌图纸设计度及尺寸算;水沟
电缆照设图纸尺寸及附清单单价量;隧道支护数量乙方
照甲方技术交底施工的实数量计算。
Tunnel excavation quantity is calculated pursuant to excavated section in tunnel design; lining
quantity is calculated pursuant to the thickness and size of drawing’s design; quantity of drainage
ditch and cable trough are calculated under the design size in drawings and unit price in appendix
list; quantity of tunnel mortar anchor and ahead of the bolt support, subject to Party B’ actual
worked number are calculated in accordance with party As technical explanation.
3、乙方应照甲方技术人的技术交底进施工。工程量以乙方照甲方技术交底完成的
施工数量为据。乙方完成的结算工程量须由甲方施工技术、质量检验工程师审核签证,
且须经项目总工审批后才能作为验工计价的据。
Party B should, pursuant to the technical direction by party As technical personnel, carry out
execution. The quantity is the same which are actual completion by party B in accordance with
party As technical direction. The settlement of quantity of party B’s completion should, prior to
being deemed as the basis of the acceptance and cost calculation, be determined by the check and
confirmation of party As engineers of technician and quality in addition to the exam / approval of
project’s general engineer.
五、 承包工程造价 Project Cost
分项工程承包单价为:见附件一《工程量清单》 结算工程数量据实完成的合工程
量计量。乙方据甲方供的施工图纸,以下的承包单价《附件 1:承包人承包工程项
目一览表—工程量清单》, 完成隧道工程有项目内容施工、工和缺陷工作。
Unit price of sub-project refer to Appendix One BILL OF QUANTITY on which the settlement
quantity will be calculated on the qualified quantity completed actually by party B. Party B will, in
accordance with party As execution drawings and subject to the unit price, viz. Project’s List and
Quantity List, make completion of any and all items of tunnel construction including execution,
completion and defect’s repair.
六、工程质量标准与验收 Project Quality Standards and Acceptance
4
1乙方必须严格按照甲方技术交底、现行铁路验收标准和铁路施工规范组施工。乙方
包的工程,必须达到国家或本现行的工程质量验收标准。
Party B should, in strict conformity with party As technical direction and existing railway
acceptance standard / norm, carry out execution hereof. The project contracted by party B should
satisfy to the acceptance standard which are stipulated by state or industry.
2因乙方因造成的施工质量的工程,乙方应规定的时无偿行返工,
果返后仍达不到验收标准的,甲方有权委派其它单人进整修,乙方承担。
Provided that any defect / unqualified work in project execution due to party B, rework should be
carried out by party B in free, where the rework is still not satisfy acceptance standard, party A is
entitle to dispatch other contractor or individual to conduct repair for which the cost will be on
party B’s account.
七、隐蔽工程检查和签证 Inspection and Confirmation of Hidden Works
1、甲方质检人员在对隐蔽工程检查,乙方应进行严格自行检查。
Respect to hidden work party B should conduct self-strict exam before the inspection by party As
quality inspector.
2、乙方一道工施工必须及时通甲方,对上道工完成工程量的确认。
Party B should, prior to conduct next work procedure, give notice timely to party A for
confirmation of the completion quantity in ahead procedure.
八、材料的供应 Supply of Material
甲方供给乙方材料单价主要材料市场执行甲方供应材料行采
,质量满足相应标准。
The price of materials which are supplied by party A to party B: main materials will be subject to
marked price, other non-party As provision of materials, the quality thereof should be satisfaction
with corresponding standards, will be purchased by party B itself.
九、工程变更 Alteration
1、建设单和甲方对原工程设计进的变更,乙方必须服从。
Any alteration to original design by employer and / or party A should be conformed with by party
B.
2、因变更延误的工期经甲方相应顺延
The delayed term due to alteration may, be subject to party As approval, be allowed
corresponding extension.
5
摘要:

铁路隧道工程施工承包合同CONTRACTOFRAILWAYTUNNELENGINEERINGCONSTRUCTION(翻译:张云军)签署日期:DateofSignature甲方:中铁集团(以下简称甲方)PartyA:ChinaRailwayGroup.(hereinafterreferredtoasPartyA)乙方:隧道工程公司(以下简称乙方)PartyB:TunnelEngineeringCompany(hereinafterreferredtoasPartyB)条款目录CONTENTS一、组成合同的文件:DocumentsConstitutedContract二、工程概况GeneralR...

展开>> 收起<<
铁路隧道工程施工承包合同(中英文).doc

共22页,预览5页

还剩页未读, 继续阅读

声明:本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。玖贝云文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知玖贝云文库,我们立即给予删除!

相关推荐

分类:人力资源/企业管理 价格:5.9玖币 属性:22 页 大小:144KB 格式:DOC 时间:2025-03-07

开通VIP享超值会员特权

  • 多端同步记录
  • 高速下载文档
  • 免费文档工具
  • 分享文档赚钱
  • 每日登录抽奖
  • 优质衍生服务
/ 22
客服
关注