劳务投标技术标

2025-06-01 0 0 715.5KB 69 页 10玖币
侵权投诉
目 录
1.编制依据.....................................................................4
1.1 文件依据...................................................................4
1.2 主要图集、规范、法律、法规依据.............................................4
2.工程概况.....................................................................6
2.1 总体概况...................................................................6
2.2 施工条件...................................................................6
2.3 招标范围...................................................................6
3.工程特点、重点、难点分析及对策...............................................7
3.1 本工程交叉作业多,需统一协调管理...........................................7
3.2 做好成品保护及安防工作是难点...............................................7
3.3 做好安全、文明、环保施工管理,防止民扰和扰民是文明施工的重点...............7
4.工程实现目标.................................................................9
4.1 质量目标...................................................................9
4.2 工期目标...................................................................9
4.3 现场安全文明管理目标.......................................................9
4.4 现场环境管理目标...........................................................9
4.5 管理目标...................................................................9
4.6 服务目标..................................................................10
4.7 工程回访目标..............................................................10
5.现场组织机构设置............................................................11
5.1 现场组织机构设置..........................................................11
5.2 公司总部对现场组织机构的授权和监管........................................11
5.3 项目管理部的组成及部门职责................................................11
6.施工准备....................................................................15
6.1 施工技术准备..............................................................15
6.2 现场准备..................................................................16
6.3 材料物资准备..............................................................16
6.4 施工机械准备..............................................................17
6.5 人员及岗位培训准备........................................................17
6.6 前期组织协调准备..........................................................18
7.施工进度计划及保证措施......................................................19
7.1 总工期安排措施............................................................19
7.2 施工进度计划管理方法......................................................19
7.3 施工进度计划保证措施......................................................21
8.劳动力计划及主要设备材料、机械的用量计划....................................25
8.1 各阶段劳动力安排计划及保证措施............................................25
8.2 主要周转材料使用保证措施..................................................28
8.3 主要机械设备使用保证措施..................................................28
9.主要施工方案的参考..........................................................30
9.1 施工方案参考原则..........................................................30
9.2 二次改造施工与已完工程接茬处理方法........................................30
9.3 地下室地坪施工方案........................................................32
9.4 地上楼地面施工方案........................................................42
1
10.质量保证体系和措施.........................................................44
10.1 工程质量目标.............................................................44
10.2 质量管理职责.............................................................44
10.3 施工准备阶段性质量控制...................................................44
10.4 施工阶段的质量控制.......................................................44
10.5 质量通病防治措施.........................................................49
11.现场安全施工保证措施.......................................................51
11.1 安全生产管理体系.........................................................51
11.2 安全生产管理制度.........................................................51
11.3 主要分部分项工程安全技术措施.............................................52
11.4 其它专项安全防护措施.....................................................54
11.5 健康卫生保证及职业病防治措施.............................................57
11.6 消防保证措施.............................................................58
12.现场文明施工、环境保证措施.................................................60
12.1 文明生活区的管理.........................................................60
12.2 文明施工保证措施.........................................................61
12.3 环境保护措施.............................................................61
13.与发包人的配合.............................................................64
13.1 配合原则.................................................................64
13.2 与发包人的沟通与协调措施.................................................64
14.劳资纠纷事件应急流程及措施.................................................65
15.现场成品保护措施(重点)...................................................66
15.1 人员组织.................................................................66
15.2 成品保护实施措施.........................................................67
16.工程移交和保修服务.........................................................72
16.1 工程移交.................................................................72
16.2 工程保修.................................................................72
16. 3 维修及服务质量的保障措施................................................72
2
1.编制依据
1.1 文件依据
(1)甲方(施工总承包单位,下同)提供的图纸。
(2)甲方提供的施工招标文件等。
(3)甲方提供的招标答疑文件及澄清等。
1.2 主要图集、规范、法律、法规依据
1、施工图纸及要求【含指定图集】
2、工程测量规范 《GBJ50026-2007》
3、建筑地基基础工程施工质量验收规范 《GB50202-2002》
4、混凝土结构工程施工质量验收规范 《GB50204-2002(2011
版)》
5、钢筋混凝土高层建筑结构设计与施工规程 《JGJ3-91》
6、砌体工程施工质量验收规范 《GB50203-2011》
7、建筑地面工程施工质量验收规范 《GB50209-2002》
8、建筑装饰装修工程质量验收规范 《GB50210-2001》
9、钢结构工程施工质量验收规范 《GB50205-2001》
10、屋面工程质量验收规范 《GB50207-2012》
11、地下防水工程质量验收规范 《GB50242-2011》
12、建筑给水排水及采暖工程施工质量验收规范 《GB50242-2002》
13、通风与空调工程施工质量验收规范 《GB50243-2002》
14、建筑电气安装工程施工质量验收规范 《GB50303-2002》
15、电梯工程施工质量验收规范 《GB50310-2002》
16、民用建筑工室环境污染控制规范 《GB50325-2001》
17、高层建筑混凝土结构技术规程 《JGJ 3—2002\J186-2002》
18、地下工程防水技术规范 《GB50108-2001》
19、建筑用 《GB/T14684-2001》
20、建筑用卵石碎石 《GB/T14685-2001》
21、金属幕墙工程技术规范 《JGJ133-2001》
22、玻璃幕墙工程质量验标准 《JGJ/T139-2001》
23、钢筋接及验收规程 《JGJ18-96》
24、钢筋接接头试验方法标准 《JGJ/T27-2001》
25、建筑施工钢管脚手架安全技术规范 《JGJ130-2001》
3
26、建筑工程施工质量验收统一标准 《GB50300-2001》
27、混凝土质量控制标准 《GB50164-92》
28、混凝土定标准 《GBJ107-87》
29、测混凝土抗压强度技术规程 《JGJ/T23-92》
30、建筑施工安全检查评《JGJ59-88》
31、建筑施工高处作业安全技术规程 《JGJ80-91》
32、建筑机械使用安全技术规范 《JGJ33-2001》
33、施工现场临时用电安全技术规程 《JGJ46-88》
34、建筑工程施工现场供电安全规程 《GB50194-93》
35、施工升降验规则 《GB/T10054-88》
36、施工升降机安全规则 《GB10055-88》
37、建筑卷扬机安全规程 《GB/T10054-88》
38、建筑卷扬验规范和方法 《GB/T6947-86》
39、建筑机械使用安全技术规程 《JGJ33-86》
40、建筑工程施工现场供用电安全规范 《GB50194-93》
41、建筑机械使用安全技术规程 《JGJ33-86》
42、框胶板模板技术规程 《JGJ96-95》
43、建筑施工高处作业安全技术规范 《JGJ80-91》
44、山西省规范、标准、规定徽省之标准、规定设计单位图纸内所述
的特要求及规定总包方的特要求
4
2.工程概况
2.1 总体概况
工程名称 迎泽桥西项目 3#/4#/5#/6#/7#/地下车库
工程二次结构及装饰装修工程
工程地址 太市万柏林迎泽桥西项目部
招标单位 中国建筑一(集有限公司
建筑面 24 万㎡
建设地点 迎泽桥西项目 3#/4#/5#/6#/7#/地下车库
合同范围 招标清单包含的全部内容
质量要求 合格且确安全文明工地
工期要求 总工期 741 期 2015 820 时间时间以
标方通知为准),整天竣期 2017 830
2.2 施工条件
环境
本工程二次结构改造工程,工地其工程继续施工
本工程对各方面的协调工作及原结构的成品保护是重
点和难点。
场地大小
据招标单位提供的施工场地位置,结合现场场地需
要,进合理置方可满足现场要材料、设备、的场地
置要求。
交通运输条件 现场通一完成。
水电设 施工用水、用电招标方提供。
2.3 招标范围
2.3.1 包括但不限于图纸及工程量清单所示范围及其全部内容
2.3.2 本工程实施上项目所有拆除本次范围
5
摘要:

目录1.编制依据.....................................................................41.1文件依据...................................................................41.2主要图集、规范、法律、法规依据.............................................42.工程概况.....................................................................62.1总体概况...

展开>> 收起<<
劳务投标技术标.doc

共69页,预览5页

还剩页未读, 继续阅读

声明:本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。玖贝云文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知玖贝云文库,我们立即给予删除!

相关推荐

分类:建筑/施工 价格:10玖币 属性:69 页 大小:715.5KB 格式:DOC 时间:2025-06-01

开通VIP享超值会员特权

  • 多端同步记录
  • 高速下载文档
  • 免费文档工具
  • 分享文档赚钱
  • 每日登录抽奖
  • 优质衍生服务
/ 69
客服
关注