xxx工程合同中英文版

VIP免费
2025-03-07 0 0 36.52KB 8 页 5.9玖币
侵权投诉
xxx engineering contract
xxx 工程合同
Contract No.:
合同编号:
Party A: xxxCompany Limited
甲方:xxx 有限公司
Party B:xxx Company Limited
乙方:xxx 有限公司
This contract is made and entered into on the day of , 2014 by the following Parties in .
本合同于 2014 年 月 日由以下当事方在 签署。
Party A: xxx Company Limited,
甲方:xxx 有限公司,xxx 经营的公司,住所地为 xxx,(下称“甲方”),法定代表人:xxx
Party B: xxx Company Limited,
乙方:xxx 有限公司,一家 xxx 经营的公司,注册地址是:xxx,(下称“乙方”),法定代表人:xxx
Party A and Party B are called by a joint name of Both Parties under this contract, each of which is called as A
Party.
甲方和乙方在本合同项下统称为“双方”,单独称为“一方”。
1. Work Content and Requirements
1. 工作内容、要求
1.1 In accordance with the items stipulated in this Contract, Party B shall conduct the project as per the Project
standard and quality standard stipulated by Ministry of Engineering of the Union of xx.
1.1 依据本合同所限定的条款,乙方应以 xx 工程部规定的建筑标准和质量要求执行本工程。
2. Contract Period
2. 合同期限
2.1 Work period for the Road Construction Project: the work shall be completed within 2 month upon signing
the Contract. The condition of handover is that the Project Inspection & Acceptance Team constituted by
Party A, shall issue the Inspection & Acceptance Sheet after onsite inspection.
2.1 本次工程14 并以甲方组成
具验收单为竣工交接条件。
2.2 This contract shall be implemented after this is duly signed by the legal representatives or authorized
representatives of the Parties and stamped with the seals of the Parties, and closed after the onsite
acceptance of the Project and Contract payment.
2.2 本合同自双方法定代表人或授权代表人签字盖章后生效,现场验收合格、款项支付完毕后关闭。
3. Health, Safety and Environment Principles (HSE)
3. 健康、安全和环境原则 ( HSE )
3.1 The staff from Party B shall follow the arrangement of Local government and Party A (or its
representatives), and comply with the laws and regulations of Myanmar as well as rules and regulations on
Health, Safety and Environment (HSE) of Party A.
3.1 乙方工作人员必须听从地方政府、甲方人员(或代表)的安排,遵守缅甸法律、法规和甲方的安全
环境健康规章制度等。
3.2 Before or during the implementation of this Project, Party B shall acknowledge, avoid and prevent the
possible damage of the Project to the surrounding environment and other affiliated facilities, and the
resulting losses shall be borne by Party B.
3.2 在工程实施之前或进行当中,乙方应识别工程可能对周边环境及原有设施造成的危害,应进行规避
和防护,对由此带来的损失,应由乙方承担。
3.3 During the performance of this Contract, Party B shall bear the personal and property losses of Party B or
Party B’s personnel injury by itself, if the losses are not caused by Party A.
3.3 在合同履行过程中,若发生非甲方原因导致的乙方或乙方人员人身或财产损失的,由乙方自行承担。
4. Contract Price, Payment and Taxes
4. 合同价格、付款事宜及税费
摘要:

xxxengineeringcontractxxx工程合同ContractNo.:合同编号:PartyA:xxxCompanyLimited甲方:xxx有限公司PartyB:xxxCompanyLimited乙方:xxx有限公司Thiscontractismadeandenteredintoonthedayof,2014bythefollowingPartiesin.本合同于2014年月日由以下当事方在签署。PartyA:xxxCompanyLimited,甲方:xxx有限公司,xxx经营的公司,住所地为xxx,(下称“甲方”),法定代表人:xxxPartyB:xxxCompanyLimite...

展开>> 收起<<
xxx工程合同中英文版.docx

共8页,预览2页

还剩页未读, 继续阅读

声明:本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。玖贝云文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知玖贝云文库,我们立即给予删除!
分类:人力资源/企业管理 价格:5.9玖币 属性:8 页 大小:36.52KB 格式:DOCX 时间:2025-03-07

开通VIP享超值会员特权

  • 多端同步记录
  • 高速下载文档
  • 免费文档工具
  • 分享文档赚钱
  • 每日登录抽奖
  • 优质衍生服务
/ 8
客服
关注